top of page

OUR WORK
From decades to days
Our projects are executed in just a few days, demonstrating the changes imagined for often decades. We transform empty alleys into vibrant hubs, abandoned lots into playgrounds, and dangerous spaces into safe heavens.































2026

Activate Main Street | Downtown Dallas

Via Futbol | Downtown Houston

Activating the Cottonwood Corridor

2025

Tulsa Learning Journey

West Dallas STEM

Glen Burnie Better Plaza

Sugar Land Better Block

Downtown Irving Reimagined

Better Block University | 2025 Cohort

2024

Dallas Greening Initiative

Better Block Detroit G7

Better Block @ Bachman Lake

Creating Connections: A Design Competition

Eastlake Street Fair Better Block

The Backyard Better Block

New Kensington Better Block

Greater Hazelwood Better Block

McKeesport Better Block

2023

Better Block San Antonio

Pleasant Grove Better Block

Better Block Flint

Phoenix District Tulsa Better Block

Placemaking Largo

Placemaking Riverdale

Corpus Christi Better Block

AARP West Dallas Multipurpose Center

Mosman Park Better Block

Quincy Better Block

2022

Fairland & Briggs Chaney Placemaking Festival

Garland Better Block

Mission San Jose Better Block

Rural Sustainability Conference

Balgaddy Better Block

East Point Better Block

Malcolm X

Suitland Better Block

AARP Wikiblock Workshop

Mesa Better Block

Boys and Girls Club Workshop

2021

Weatherford Parklets

The Park at Forest-Audelia

St. Cecilia's Outdoor Classroom

SOVA Better Block in a Box

Quincy Better Block

Pike District Connector

MLK Food Park

Dallas Street Seats

2020

Bike Harwood

Covid 19: Face Shields

McKinney Custom Box and Prince George’s County Box

McKinney Parklet

Slow Streets: KCMO and Dallas

TBK Bank Plaza

2019

Vickery Better Block
For this North Dallas project, we worked to turn an empty parking lot into a plaza, creating a safer space for students as they walked to and from school. It had been a rough couple of weeks: a tornado had ripped through Dallas just a couple blocks from the project site; it was hard to convince property owners to remove the bars from their store windows; and as always, time and budgets were short. We were racing to get everything finished, and at 6 pm, a group of about 100 neighborhood kids descended on the site. We have seen many incredible moments when a project is officially unveiled, but this one was unlike any other. Kids were squealing with delight as they (stress) tested out the swings, explored the renovated shipping container, and found their self-portraits on the tile wall. Several of them hugged us. One of them exclaimed it was like Disney World.
This project served as an example of one of our permanent installations that has transitioned into a new stage of programming and altering through a community manager working to engage the community and perform continued studies to improve the space's safety and function. The intervention has been named TBK Bank Plaza in honor of the programming grant given by TBK Bank to fund the success of our Vickery project's second phase.
READ ARTICLE: https://www.betterblock.org/post/fighting-crime-with-design

2018

Ottawa Better Block

Hillside Better Block

White Flint Better Block

Slavic Village Better Block

Copenhagen Study Tour

Traffic Calming in Euclid

Parking Day 2018

Aberdeen Better Block

Under Conestruction

FD18

World's Largest Cheese Barn

EarthX 2018

2017

Barberton Better Block

Kenmore Better Block

Historic Northwest Rising

FD17

Norview Five Points Better Block

Belmont Better Block

Park(ing) Day 2017

Exchange House

2016

Livable Livernois

Macon Connects

Cuyahoga Falls Better Block

WikiBlock Library Launch

Frenchtown Better Block

Middlebury Better Block
bottom of page
